|
Who's Online
There currently are 5946 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
;
Purchased the manual that I was looking for at a great price and could download it easily.. Great service experience and for future purchases I plan to use the site.
Thank you very much
DECK MECHANISM ADJUSTMENT
5. Audio/Control (A/C) Head Adjustment
Purpose: To insure that the Tape passes accurately over the Audio and Control Tracks in exact Alignment in both the Record and Playback Modes.
5-1. Preliminary Adjustment (Height and Tilt Adjustment) Perform the Preliminary Adjustment, when there is no Audio Output Signal with the Alignment Tape. Test Equipment/ Fixture
� Blank Tape � Screw Driver(+) Type 5mm
-0.05
Test Conditions (Mechanism Condition)
� Play the blank tape
Adjustment Point
� Tilt Adjustment Screw(C) � Height Adjustment Screw(B) � Azimuth Adjustment Screw(A)
Adjustment Procedure/Diagrams
1) Initially adjust the Base Assembly A/C Head as shown Fig. C-5-1 by using the Height Adjustment Screw(B). 2) Play a Blank Tape and observe if the Tape passes accurately over the A/C Head without Tape Curling or Folding. 3) If Folding or Curling is occured then adjust the Tilt Adjustment Screw(C) while the Tape is running to resemble Fig. C-5-3. 4) Reconfirm the Tape Path after Playback about 4~5 seconds.
NOTE
Ideal A/C head height occurs, when the tape runs between 0.2~0.25mm above the bottom edge of the A/C head core.
A/C Head P4 Tape
10.9
Tape
0.2~0.25mm
A/C Head Base Fig. C-5-1 Fig. C-5-3
X-Value Adjustment Hole
Fixed Screw
Azimuth Adjustment Screw(A)
Tilt Adjustment Screw(C) Height Adjustment Screw(B)
A/C Head Assembly Fig. C-5-2
82
|
|
|
> |
|