|
Who's Online
There currently are 5780 guests online.
|
Categories
|
Information
|
Featured Product
|
|
|
|
|
There are currently no product reviews.
;
El producto satisface las necesidades del servicio t
;
This is a good quality scan of the Operation & Maintenance (Service) Manual for the PAL version of this high-band broadcast umatic, BVU-800P
All schematics and lineup procedures appear to be included in this one manual AFAICT.
The file size is just over 113 MB which gives an idea of the quality and number of pages.
All of the schematics, which contain some fairly small print, are easily readable when you zoom into the page.
John Thompson, Newcastle Upon Tyne, England.
;
Good quality, all schematics of few of models. There is also short form of user manual and regulation manual.
;
Perfect copy of the service manual. you can enlarge every page, and it comes up
with all details.
;
It´s very very nice manual with all, what i need. Original in good quality. Very fast business. Very much thanks...
ELECTRICAL ADJUSTMENT
A MAIN C.B
2
3
SFR101
B A C
R135(6.8�) R136(1.8�) R137(10�)
VOLUME VR101
PH
PHONES
12
J102
1
<TAPE PLAYER> 1. Azimuth Adjustment Settings : � Test tape : � Test point : TTA-320 PHONES JACK (J102) 2) Set the tape speed (using speed adjustment SFR). 3) Restrict the motor rotation by hand (or turn PAUSE ON). 4) Remove your hand and listen to the beginning of the tape-run. 5) When the rise of tape running is smooth, no more adjustment is necessary. If wow continues for 1 to 2 seconds at the rise time, Reduce the combined resistance according to procedure 6 and check that the tape starts running smooth. 6) Solder the resistor pattern according to the table below. 2. Tape Speed Adjustment Settings : � Test tape : � Test point : TTA-100 PHONES JACK
Pattern High resistance(C) Medium resistance(B) Low resistance(A) (Procedure 1 above) Open Solder Open Step(1) Open Open Solder Step(2) Solder Open Solder Step(3) Open Solder Solder
� Adjustment location : Azimuth adjustment screw � VOLUME : � GEQ : MAX NORMAL
Method : Play back the 8kHz signal of the test tape and adjust so that the output becomes maximum.
(J102) � Adjustment location : SFR101 � GEQ : NORMAL Method : Play back the test tape and adjust for 3015Hz ± 10Hz. 3. Motor Load Adjustment Perform the STOP to PLAY after the motor is replaced. When the tape starts running smooth, this adjustment is not necessary. this adjustment following the procedure below. 1) Solder only medium resistor pattern (B) of the MOTOR AND GOVERNOR MATCHING ADJ. Resistor group.
7) Finally recheck the tape speed. Caution : Cool the patterns down to normal temperature after soldering. If the pattern remains heated, the governor circuit does not operate normally.
|
|
|
> |
|